Reviews that do not happen
Filling a gap in an existing block with federal assistance has required an environmental review written for highways and dams. The law exempts those projects, which removes both a bill and a delay.
▸ Show reasoning & sources ▾ Hide reasoning & sources
Value
The stream is two things a review consumes: the money paid to consultants and staff to produce it, and the months in which a finished plan waits for it. Both are priced at the middle of the scale, the level this site uses for the cost of running a rule, and the delay is converted through the housing that stands empty rather than through anybody's time. It is a real cost rather than a transfer, because the hours and the fees are consumed and the months do not come back. Nothing is counted for the environmental protection given up, which is the argument opposite. Nothing is counted for the projects that never start because of the review, which would be larger and is not estimated. The value is the middle of the scale, and the delay is priced through the homes that stand unbuilt rather than through anybody's waiting time.
Impact
The housing department processes something like four thousand environmental actions a year on assisted projects, at roughly 30,000 euro each in consultant and staff time, in a range from 10,000 to 100,000 depending on whether a full assessment is required. That is 120 million euro a year. The larger part is the delay: about 1,200 infill and rehabilitation projects a year of roughly forty units each are held for something like six months, and forty units unoccupied for six months at 400 euro of net housing value a month is 115 million euro a year. Together that is 235 million euro. The delay figure is the softer of the two and its range is wide, from two months to eighteen. Nothing is counted for the review work that will still be required where a project does not fall into an exempted category. The Impact is the largest here and it is the only figure in this evaluation that does not depend on anybody changing their behaviour.
▸ Show calculation ▾ Hide calculation
| Environmental actions a year on assisted housing projects [2] | 4,000 actions | ||
| × | Consultant and staff cost each Setting, range 10,000 to 100,000 euro, depending on whether a full assessment is required | 30,000 euro | 120 million euro a year |
| + | Plus the homes standing unbuilt while the review runs Setting, range 2 to 18 months: a project held by review is usually held by financing and permits as well [1] | 1,200 projects × 40 units × 6 months × 400 euro | 235 million euro a year |
| × | Weight of a euro in public and project budgets the standard weight this site uses for money spent on running a rule | 1.0 | 235 million euro a year |
| ÷ | Normalised Impact scale of this evaluation | 50 million euro a point | 4.7 |
Plausibility
The counterfactual is the same projects under the review requirement as it stood before July 2026. The exemption is written into the statute, so whether the review happens is not in question; what is estimated is how much it was costing. Consultant fees for environmental assessments are commercial prices and are published in project budgets, and the housing department reports the volume of environmental actions it processes, so both inputs are observed rather than modelled. The confounder that matters is that a project delayed by review is often delayed by several things at once — financing, local permits, contractor availability — so removing one queue may not shorten the wait by the full six months. That is named and unresolved, and it is why the delay range runs down to two months. Reverse causation does not arise. The Plausibility is high: the exemption is statutory and the costs it removes are prices and published volumes.
Counterfactual: the same projects under the review requirement as it stood before July 2026. Design: definitional — the exemption is statutory and the costs removed are commercial prices and published volumes; no behavioural link carries the money part. Confounder: a project delayed by review is usually delayed by several things at once, so removing one queue may not shorten the wait by the full six months; named, unresolved, and the reason the delay range runs down to two months. Direction: not applicable. Ceiling: precedent 8.5, held at 8.0 for the delay half of the figure.